DAY 111: It's Raining, It's Pouring, We're Still Working Today

We had such great hopes of getting up the  main floor ICF.  It rained and rained some more.  We finally gave in to the weather around 1:00 pm (very unlike us...)

Brent covered the entire main floor with heavy plastic.  It really helped.  We still needed to sweep all the water off of the deck.  That job fell to me and Cole.

 Cole spent a bunch of time sweeping water into the stair well.  He rigged up a drainage system with the ICF teeth protectors and ran the water out the back door.  Now we just have an ice skating rink in the back yard.  The basement ended up with a lot of water but we got much of it swept out.  Brent and Cole also worked on all the "buck" bracing for the main floor windows and doors.  Not an overly productive day, but it's still work!